DEESIDE POWER (UK) LIMITED

12 unique locations (438 components)

Active MW: 0.00 MW
Inactive MW: 981.07 MW
BRIDGE MILL WAY, TOVIL, MAIDSTONE, KENT, ME15 (2 components)

EV charging on residential premises

Active • 2026-27 (T-4)
CM24 (19 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
92.51 MW
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (2 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Active • 2018-19 (T-1), 2017-18 (T-1)
DN19 (21 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
DY5 (50 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
7.25 MW
HP13 (99 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
NP10 (91 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
OLYMPIC CRESCENT BROOKLANDS MILTON KEYNES MK10 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
92.51 MW
PE8 (64 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
92.51 MW
S36 (87 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
92.51 MW
Slade Lane Brig West Yorkshire HD6 (1 component)

Deeside CCGT Power Station.

Inactive • 2018-19 (T-1)